I wanted to document my rebuild this past spring for 2 reasons. The first reason is to help with any possible sale of the boat down the road. And 2 most importantly to help other people with thier own future builds. I pulled the floor up (that I replaced half assed 5 years ago) April 29 and launched the boat completed June 29. I did all the work outside during a rainy spring before and after work and between storms while working 6 days a week. All wood work done by my friend who is a great carpenter. Matierials from US composites: 10gal 435 polyester resin. 20yrds 1708 biaxl fiberglass matting. 4lbs urethane foam (80lbs) kit. 24 tubes of west system six ten epoxy. Sixty ten was used to glue the stringers to the hull fill voids and glue the pucks back into the floor where I poured the foam. All wood marine ply all hardware stainless