Another season started at the shop, been there since the last week of March and already have tons of work piling up. Many engine repowers scheduled and this nightmare job. This is a 28 foot Mako center console that's getting completely redone, all aluminum rails and T-top piping are getting powder coated, the outside of the hull is getting a repaint, two brand new Evinrude G2's are being installed, and the gas tank is getting replaced. The tank in this is 175 gallons and is just over 8 feet long. Needless to say is wasn't easy pulling it from the boat. We used our crane to hoist it out.