General Category > General Discussion

starting the rebuild and fiberglass supplies

<< < (6/6)

melinprov:
and here's my simple drain system, I ran a split PVC pipe down both sides of the center and will foam over it after using PL glue to secure it and I will build a front bulkhead and put flexible hose from all the separate front bow rider areas to the open chamber before the foam. the back area on the sides above will be all foam also with a smaller pipe to the rear and a hole in the back bilge box on either side.I'm hoping that this area will never see any water --but just in case

melinprov:
where I am at now-ran out of resin but it should be here monday

melinprov:
so...working mostly on the weekends and during the day before it goes over 95-Im ready to drop in and do the deck

Navigation

[0] Message Index

[*] Previous page

Go to full version