Wow, how much time did you have in the stringer and floor work? It looks like I could do the stringers with the seacast product for under 300, cant imagine it would take anywheres close to 5 gallons of product. Do you have any photos here on the site or ones to share of what you did? I think I might be into something very similar as to yours.
I'll look for my parts lists from when I did the work. As far as the thread on this site, I don't think I posted much about it. I think it was before I was active here. I have all the pictures from the rebuild I can post if you want. My 18 was my first rebuild that was done at my uncles shop under his guidance. He does this for a living.
Sent from my SPH-L720 using Tapatalk